The Horseshoe Bend Water Treatment Plant, completed in 2003, captures surface water to slow the rate of fill of the Berkeley Pit lake. In the future, the plant will capture and treat water to prevent Pit water from rising further. Photo by Justin Ringsak.

Water treatment plant working as expected

The Horseshoe Bend Water Treatment Plant, completed in 2003, captures surface water to slow the rate of fill of the Berkeley Pit lake. In the future, the plant will capture and treat water to prevent Pit water from rising further. Photo by Justin Ringsak.
The Horseshoe Bend Water Treatment Plant, completed in 2003, captures surface water to slow the rate of fill of the Berkeley Pit lake. In the future, the plant will capture and treat water to prevent Pit water from rising further.

Looking northeast from the Berkeley Pit viewing stand, visitors can see one of the most important components in the future management of the Pit: the Horseshoe Bend Water Treatment Plant. Sitting on four acres near the former McQueen neighborhood, about 600 feet east of the Berkeley Pit, the treatment plant was constructed in 2002-2003. It sits on native land that is very stable, and the plant was built to withstand the maximum probable earthquake.

The facility was designed to treat up to seven million gallons per day, or about 5,000 gallons of water per minute. The facility cost approximately $18 million to build, and, depending on how much water is treated, operating expenses run about $2 million per year.

Once the Berkeley Pit water comes online, which is projected to happen in 2023, annual operation and maintenance costs could be as high as $4.5 million. Under the terms of the 2002 Consent Decree negotiated with the government, BP-ARCO and Montana Resources have agreed to provide financial assurances to pay operation and maintenance expenses in perpetuity. The two companies also paid all construction costs for the facility.

The actual construction of the treatment plant was a massive undertaking. It is estimated that workers put in 125,000 hours of total labor, and the facility also required more than 4,500 cubic yards of concrete.

The general construction contractor and subcontractors were all from Montana, with several from Butte, and, during the course of construction, they reported no safety incidents of any kind.

As per the schedule listed in the 1994 EPA Record of Decision and included in the 2002 Consent Decree, based upon current water level projections, a review of the Horseshoe Bend Water Treatment Plant design and operation would begin in 2019. Any necessary upgrades would have to be completed by 2021, two years before Pit water itself is currently projected to be pumped and treated in 2023.

In November, 2007, a performance review of the Horseshoe Bend plant was completed by Montana Resources, ARCO, and North American Water Systems, with cooperation from the Montana Bureau of Mines & Geology, the Department of Environmental Quality, and the EPA.

The performance test was undertaken to ensure that the treatment system is capable of meeting the water quality standards set in the Consent Decree for the site. For this test, only water from the Horseshoe Bend drainage was treated, as water from the Pit is not yet required to be pumped and treated at the plant.

The test began on November 18, 2007, and continued for 72 hours. All of the water quality standards for contaminants of concern were met. Additional adjustments still need to be made to address pH. For this test, the pH was kept at a high (basic or alkaline) level in order to effectively remove contaminants of concern and meet water quality standards.

The optimization of the plant in the future may result in a lower pH. Additionally, methods of adjusting the pH prior to discharge to Silver Bow Creek have been evaluated conceptually. Any method of adjusting the pH will be formally evaluated, if necessary, before any water from the plant is discharged to Silver Bow Creek.

A clarifier, drained for maintenance, at the Horseshoe Bend Water Treatment Plant. The plant will eventually be required to treat water from the Berkeley Pit. Photo from the EPA Five Year Review Report (2011) for the site.

Treatment technology thoroughly studied

The Berkeley Pit is literally world famous in the mine waste cleanup industry, and the final technology used in the Horseshoe Bend Water Treatment Plant, a High Density Solids (HDS) process, was selected after an assessment of tests and the demonstrated effectiveness of cleanup technologies from research groups around the world.

A clarifier, drained for maintenance, at the Horseshoe Bend Water Treatment Plant. The plant will eventually be required to treat water from the Berkeley Pit. Photo from the EPA Five Year Review Report (2011) for the site.
A clarifier, drained for maintenance, at the Horseshoe Bend Water Treatment Plant. The plant will eventually be required to treat water from the Berkeley Pit.

The Horseshoe Bend facility currently treats water from Horseshoe Bend, and will eventually be used to treat water from the Berkeley. The treatment plant utilizes a two-stage lime (calcium hydroxide) precipitation process in combination with HDS technology. Lime, aeration and polymer addition remove metals from the water. The fully automated facility generates about 10 times less sludge than a conventional lime treatment plant. HDS technology produces denser sludge through a recycling process in which the sludge generated in the water treatment process is sent through the system many times.

The process resembles a snowball effect. Each time sludge particles are sent through, they grow in size as new particles attach to the old ones. At the end, the final sludge product – like a watery mud – is much denser.

Horseshoe Bend Treatment Plant Sludge Reduction. Graphic by Justin Ringsak.
Horseshoe Bend Treatment Plant Sludge Reduction

The relatively low final volume of sludge – currently about 40,000 gallons per day in a 220,000-gallon slurry – is deposited in the Berkeley Pit, eliminating the need for a land-based sludge repository. Test results indicate that sludge disposal in the Pit may raise the pH of the water over a 10- to 20-year period, which could potentially decrease treatment costs for Pit water.

Due to the design of the system, treated water can easily be used in the concentration process at the adjacent Montana Resources mine, or, in the event that the mine ceases operations, discharged to Silver Bow Creek upstream from the confluence with Blacktail Creek near Montana Street. The volume of treated water should add about 4.5 cubic feet per second (cfs) of flow to the creek, which represents about a 50 percent increase to the base flow of 10 cfs.

A performance test of the Horseshoe Bend plant was completed in November 2007, as mandated by the Record of Decision. Based on the performance review, water discharged from the plant meets all discharge standards for contaminants of concern set by the EPA. Additional adjustments still need to be made to address pH. In general, plant operations are going as expected.

This image from the Montana Bureau of Mines & Geology illustrates the connections between historic underground mining tunnels and the Berkeley Pit. After groundwater pumping ceased in 1982, the tunnels, and eventually the Pit, began to fill with water.

Mine Resumption Affects Treatment Plant Operations

This image from the Montana Bureau of Mines & Geology illustrates the connections between historic underground mining tunnels and the Berkeley Pit. After groundwater pumping ceased in 1982, the tunnels, and eventually the Pit, began to fill with water.
This image from the Montana Bureau of Mines & Geology illustrates the connections between historic underground mining tunnels and the Berkeley Pit. After groundwater pumping ceased in 1982, the tunnels, and eventually the Pit, began to fill with water. Click on the image to view a larger version.

Since the last issue of PITWATCH, Montana Resources has decided to resume operations. With the mine going again and with the water treatment plant coming on line, there have been many questions from the community. Here are some answers to reader questions.

Q: How much total water went into the Berkeley Pit since the suspension of mining at Montana Resources?
A: About 7.5 billion gallons of water or an average of 6 mgd has gone into the Pit since MR suspended operations. An average of 3.4 mgd of this total was from the underground workings and storm water flow. An average of 2.6 mgd of this total was from the Horseshoe Bend discharge.

Q: How much water will go into the Pit once mining operations resume completely and the water treatment facility is operating?
A: The Horseshoe Bend drainage flow will be treated in the new treatment plant, and presently, this water will be entirely consumed in the mining operations. The remaining 3.4 mgd of flow from the underground workings and storm water flow will still flow into the Pit contributing to the rising level there. Eventually, when the water level approaches 5,410′ above sea level (expected about 2018), water will have to be pumped from the Berkeley Pit and treated at the Horseshoe Bend facility. Having the plant in place provides assurance that the capability is there when it becomes necessary to treat Pit water.

Q: Where will the treated water go?
A: Current plans are to treat the entire Horseshoe Bend drainage flow at the treatment plant, and then route all of the treated water to the concentrator for use in mine operations. As a result, and for as long as the treated water is used in the mining circuit, there will be no discharge off-site. In the event the mine was to suspend operations again, Horseshoe Bend drainage water would be treated to discharge standards at the plant. Then it would be transported by a pipeline, being constructed along the historic Silver Bow Creek channel (Metro Storm Drain), to its confluence with Blacktail Creek, just west of the Visitor’s Center on George Street in Butte, Montana.